Nomadic farming

 

 

 

A strategy to improve the issue of food security in remote Australian communities through mobile infrastructure

 

 

 

 ________________________

 

Issues

 

 

 

 Nomadic agricultural infrastructure provides access to food production resources, decreasing the reliance on importing
and exporting produce and increasing agricultural land

 

150607 RENDER Grain silo in landscape 2030
2030 – Mobile Infrastructure (Grain Silo) in landscape

 

 

150607 RENDER Grain silo in landscape 2050
2050 – Increasing arable land

 

 

 

 

151610 AXO production line

 

 

 

 

 

Mobile Infrastructure & vehicles

 

150610 ELEVATION machines
 


150610 DIAGRAM collection production system


150607 RENDER Abattoir

Mobile Abattoir/Dairy collecting cattle

 

 

 

 

 

Effect on sub-node communities

 

150610 SITEPLAN treeti

 

Mobile Infrastructure docking into Tree Ti
Dock is located at the edge of sub-node towns, for the town to expand and grow around the docking station

 

150607 RENDER Abattoir in dock

 

Kitchen of Abattoir/Dairy is used as a restaurant or food service in docking station

 

Western Boundary

 

Lines_base_500

Site Plan showing western boundary of water system. Pavilions linking surrounding landscape.

 

 


 

Flood section

Flood condition section.

Showing pavilion below water line inundated with flood waters. Lookout can proves vantage point of flood plains.

 


top lookouts flooded persp

View from within boundary of town. Showing wetlands transitioning muddy flood waters into town system.

 

 


inside lookout persp 2

View inside lookout below flood line. Shown during dry season. Flood line visible as marking on wall.

 

 


Next PointNOLLI

Return to schemeLARGE-PLAN2

Town Centre

 

NOLLI

Nolli Plan showing activation of pedestrianised main street


 

__Bar section2

Section through main street. Showing intervention knitting town together & activating space. In this case  connecting to pubs on either side of the road.


 

 

 

Bar persp

The new spaces created ensure the system is integrated into the township successfully.

Interactions with water are highlighted through exposed sections of the wetland as well as a deliberate staining of the internal walls during wet seasons via the roof.


Next Point_westLines_base_500

Return to schemeLARGE-PLAN2

 

Cross-overs

MIDDLE_Lines_base_500

Site plan showing integration of residential, public (school & oval) and new docking station, via roof/wetland network


NEW complex sectoin _DESAT

Long section showing roof and wetland network weaving together the town

 

zoom_1

Public spaces created

 

 

zoom_2

Public linking with residential spaces.  Wetland creates a micro-climate to link to houses using evaporative cooling & shading.

 


Return to schemeLARGE-PLAN2

Regional system5001-15-lima-ArtesianGroupDiag

 

Winton Water Scheme

LARGE-PLAN_3

 

[Navigate]
1                                           2                                           3                                          4
Lines_base_500     NOLLI      _westLines_base_500      MIDDLE_Lines_base_500
Regional system
5001-15-lima-CL-ProcessDiag


Issues Currently Faced:

flood                  aquifer-draw       rain

Seasonal Flood Inundation                                      Depleting Aquifer Reserves                                     Rainfall Under-utilised


Systems to be implemented:

GIF2

WETLAND CLEANSING DIAG

Cleansing wetland system implemented